Specification DASS Fill & Drain Rigs – Qatar

Our task was to manufacture and deliver 6 sets of 03 DASS Fill and Drain rigs for the BAE Systems export market, Qatar.
Replacement Refrigeration Plant for The Brazilian Navy

Lightfoot successfully bid for the contract to design and build a multi-room refrigeration plant for the Brazilian Navy flag ship aircraft carrier SAO PAOLO.
Multi-room refrigeration system and air conditioning plants installed on an oil rig

Lightfoot were contracted to supply a multi-room refrigeration system that included significant redundancy.
Design review of on-board air-conditioning systems for the Royal Navy

As part of our commitment to the Royal Navy for continued through life support of their installed equipment, Lightfoot was tasked with carrying out a detailed review of the air-conditioning and associated systems as the equipment OEM.
Build & Delivery of 27 LIDSS units to the UK Ministry of Defence

The UK Ministry of Defence required a new machine to replace an interim solution that had been in service for 15 years which was no longer fit for purpose. The design requirements of the machine meant it had to be capable of recovering, replenishing, vacuum dehydrating, and pressure testing the DASS system on their Typhoon aircraft.
FGAS Modification update to Apache ECS Carts

Lightfoot Defence was required to modify the Apache Environmental Control System (ECS) Carts in order to make them compliant with current FGAS legislation.
DASS Cooling System Integrity Assurance Equipment (DCSIAE)

Airbus Defence & Space (AD&S) GMBH required a series of tools and bespoke engineering jigs to be able to check the integrity of their Wing Tip Pod refrigeration pipework system.